Skip to content

Custom software for cabinet and millwork shopsEvery cabinet, every finish, every delivery, on track.

For cabinet makers and architectural millwork shops. One system from the design and the deposit to the CNC, the finish room and the install.

Book a free call
a cabinetmaker and a designer reviewing a kitchen layout at a workbench

Sound familiar?

A kitchen is a hundred boxes, doors and parts that all have to show up finished, at the same time, at the right house. The design software knows the parts. Nobody knows where they are.

  • Design changes keep coming after the order is cut.
  • Parts go missing between the CNC, the edgebander and the finish room.
  • Finish samples and approvals are scattered.
  • Hardware and appliance specs show up late.
  • Installs get scheduled before everything's ready.
  • Punch lists drag on and the final payment waits.

How work moves through a shop

This is the path a job usually takes. Every step hands something to the next one, and that hand-off is where things get dropped.

  1. 1Measure and design
  2. 2Customer approves layout and finishes
  3. 3Deposit in, design locked
  4. 4Engineer cut lists and CNC files
  5. 5Cut, band, assemble and finish
  6. 6Stage and confirm everything is ready
  7. 7Install, punch list and final payment

The software most cabinet shops juggle

Design and cut-list software is excellent in this industry. What's missing is everything around it. Under each, what it leaves out.

Design and engineering

Cabinet Vision, Microvellum, Mozaik, KCD, Cabinet Pro

Turn designs into cut lists and CNC code. Customer approvals, scheduling and delivery happen outside it.

CNC and optimizing

The router's software and panel saw optimizer

Cuts the parts, but doesn't tell the office what's done.

Estimating

Spreadsheets or the design software's pricing

Gives a price, but rarely compares it to what the job really cost.

Accounting

QuickBooks

Deposits and invoices, not production status.

The glue

Paper job folders, the finish room's notebook and texts

How anyone knows what's ready to install.

Each of these does its own piece well. None of them follows an order from the first quote to the final payment, so the gaps get filled with spreadsheets, whiteboards, texts and somebody's memory. That's the part we build: one system around how your shop actually runs, connected to the tools worth keeping.

What your system takes care of

Built for kitchens, built-ins and commercial millwork.

Locked designs

Once the customer signs off, changes need a change order and a new price.

Finish and hardware selections

Samples, colors and hardware chosen and approved in one place.

Parts tracked through the shop

Each part is scanned off the CNC, through banding, assembly and finishing.

Ready-to-install check

An install can't be booked until every part is finished and staged.

Install and punch list

Installers check off the punch list on a phone and the final invoice follows.

Cost by job

Material, labor and finish time against what you quoted.

Everyone sees their part

When something changes, the right people hear about it, and every message stays with the job. Outside the business, that includes homeowners, designers, builders and installers.

How it keeps everyone on the same page →
You
Jobs by stage, what's late, deposits and cash owed
Your designers
Approvals waiting and changes to price
Your shop lead
Today's cuts, what's in finish, what's staged
Your customers
Selections to approve, install date, punch list, pay online

What it replaces

The paper job folder, the finish room notebook, the install calendar and the punch list that lives in a text thread. We pick up where your design software leaves off.

a shop worker scanning a label on a finished cabinet door

What your Operations Map adds up

Design and engineering
Cabinet Vision, Microvellum, Mozaik, KCD, Cabinet Pro
✓
CNC and optimizing
The router's software and panel saw optimizer
✓
Estimating
Spreadsheets or the design software's pricing
✓
Accounting
QuickBooks
✓
Hours tracking parts and booking installs✓

We add up what you pay for these today and the time your team loses, so you see your real savings, and a fixed price, before you commit.

How a week could go

A kitchen that installs in one trip

Every box and door is scanned as it's finished. On Thursday the system shows the Smith kitchen 100% staged, so the office books Monday's install and texts the homeowner. The crew finishes the punch list on their phones before they leave, and the final invoice goes out that afternoon.

See our work →
homeowners shaking hands with an installer in a new kitchen

Other manufacturers we work with

Tech and electronic componentsOil and gas tools and equipmentMachine shopsMetal fabrication and weldingSign shopsStone and countertop fabricatorsPrecast and concrete productsPlastics and injection moldingTrailers and truck bodiesPowder coating and finishingPrinting and promotional productsFood and beverage producers
All manufacturers →

Want to see if this would help your business?

A free call, then a free Operations Map: how your business runs today, what we'd build, and a fixed price. Yours to keep either way.

We take on only 2 or 3 new businesses a quarter. See a sample Operations Map →

Book a free call