Skip to content

Custom software for remodeling contractorsHappy homeowners, clear budgets, jobs that finish.

For kitchen, bath and whole-home remodelers. One system for leads, design, selections, budgets, subs, change orders and the final walkthrough.

Book a free call
a remodeler showing a couple tile selections at their kitchen table

Sound familiar?

Remodeling is half construction, half customer care. The homeowner lives in the job, picks a hundred finishes and wants to know what's happening every day.

  • Selections get made late and hold up the job.
  • Change orders are agreed to in the kitchen and never written down.
  • Subs show up out of order.
  • Homeowners text the owner at night for updates.
  • Budgets drift and nobody notices until the end.
  • Punch lists drag on for weeks.

How work moves through a company

This is the path a job usually takes. Every step hands something to the next one, and that hand-off is where things get dropped.

  1. 1Lead and first walkthrough
  2. 2Design and estimate
  3. 3Contract and deposit
  4. 4Homeowner makes selections
  5. 5Subs scheduled in order
  6. 6Build, with change orders along the way
  7. 7Punch list and final payment

The software most remodelers juggle

Remodelers often have a project tool, a design tool, an estimating sheet and accounting, plus a lot of texting. Under each, what it leaves out.

Project management

Buildertrend, JobTread, CoConstruct (now part of Buildertrend), Houzz Pro

Full of features. Many teams use a slice of them and keep their own process on the side.

Design

Chief Architect, SketchUp, 2020 Design

Make great plans, but selections and prices get re-entered elsewhere.

Estimating

Excel or the project tool's estimator

Gives a price, but job cost is rarely compared to it.

Accounting

QuickBooks

Gets the payments, not the change order you forgot.

The glue

Texts with homeowners, subs and a paper punch list

How the job really gets run.

Each of these does its own piece well. None of them follows a job from the first call to the final payment the way your company actually runs it, so the gaps get filled with spreadsheets, group texts and somebody's memory. That's the part we build: one system around how you work, connected to the tools worth keeping.

What your system takes care of

Built for work inside someone's home.

Selections with deadlines

Each finish has a due date tied to the schedule, and homeowners pick online.

Change orders signed first

Every change is priced and signed on a phone before work starts.

Subs in sequence

Subs get booked in order and told when the job before them slips.

Daily updates

Homeowners get a short update with photos at the end of each day.

Budget vs. actual

Every line of the budget shows what's been spent.

Punch lists that close

Items assigned, photographed and checked off; final payment follows.

Everyone sees their part

When something changes, the right people hear about it, and every message stays with the job. Outside the business, that includes homeowners, designers, subs and suppliers.

How it keeps everyone on the same page →
You
Jobs, budgets, change orders, cash owed
Your project managers
This week's schedule, selections due, subs
Your subs
Their dates and the job details
Your homeowners
Daily updates, selections, change orders, pay online

What it replaces

The texts with homeowners, the selection spreadsheet, the change orders on scrap paper and the punch list nobody finishes. If your project software is working, we connect to it and fill the gaps.

a project manager photographing a finished bathroom

What your Operations Map adds up

Project management
Buildertrend, JobTread, CoConstruct (now part of Buildertrend), Houzz Pro
✓
Design
Chief Architect, SketchUp, 2020 Design
✓
Estimating
Excel or the project tool's estimator
✓
Accounting
QuickBooks
✓
Hours texting homeowners and subs✓

We add up what you pay for these today and the time your team loses, so you see your real savings, and a fixed price, before you commit.

How a week could go

A tile choice that doesn't stall the bathroom

The tile has a six-week lead time, so the system sets its pick deadline eight weeks before install. The homeowner gets reminders, picks online, and the order goes out the same day. When the tile ships, the tile setter's date is confirmed.

See our work →
homeowners shaking hands with a remodeler in a new kitchen

Other trade contractors we work with

RoofingHVACPlumbingElectricalConcrete and foundationsCustom home buildersFencingPool buildersSolar installersPaintingFlooringHardscape and landscape constructionWater and fire restoration
All trade contractors →

Want to see if this would help your business?

A free call, then a free Operations Map: how your business runs today, what we'd build, and a fixed price. Yours to keep either way.

We take on only 2 or 3 new businesses a quarter. See a sample Operations Map →

Book a free call